PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing handrails at Stair -3 Facing West.jpg Copper piping at the 3rd floor Facing East.jpg Installed fleece back at the high roof Facing South.jpg Installing bathroom carriers at the 4th floor bathrooms Facing North.jpg Installing copper piping at the 3rd floor Facing North.jpg Installing handrails at Stair -3 4th Floor Facing North.jpg Installing sprinkler branches and heads at the 4th floor Facing East.jpg Installing sprinkler branches and heads at the 4th floor Facing North.jpg Laying out block at Corridor 149 Facing South-East.jpg
Previous pageNext page Installing copper piping at the 3rd floor Facing North
Installing copper piping at the 3rd floor Facing North